Beckenham Improvements work update 16 April 2018

Diversion of 352 Bus will now take place from the end of April

From the end of April, (exact date unknown yet) the High Street from Kelsey Square to the War Memorial will not be two way. This is to create sufficient safe space for the contractors to carry out works on the opposite side of the road. The 352 bus will therefore be diverted up the High Street and around Rectory Road. It will stop at stop J in High Street near Manor Road and G in Rectory Road opposite the tram stop. It will not stop at C in High Street, outside M&S, to avoid overloading this stop. Stop R in High Street outside the old Risto restaurant and stop V in Rectory Road outside River Grove Park will be closed until the end of the works.

Works 116 to 180 High Street.

Completed works

  • Paving has continued south of the existing pedestrian crossing opposite Lidl with kerbing in advance reaching Santander at 212-214 High Street.
  • The entrance to Leather Alley has been excavated. It has been discovered that a large hole has appeared in the void at the entrance. Reinstatement was delayed whilst Thames Water investigated where their pipe was leaking. The reinstatement works will now be completed by Tuesday 17 April.
  • The pedestrian island in The Drive has been temporarily removed in anticipation of works to this corner to ensure there is sufficient space for vehicles, whilst providing a safe working environment for the contractors.
  • The existing small, on street compound has been moved to the parking bays outside 258 to 262 High Street. The bays will therefore be out of operation.

Next week’s works.

  • Footway and kerbing will continue south to The Drive. This phase of works is anticipated to be complete by the 30th April 2018 subject to construction complications or adverse weather.
  • Tactile paving is being continued to be re-laid at Thornton’s Corner. A high quality granite product has always been specified for this area to complement the granite paving. The concrete tactile paving was a temporary measure.

Hours of Operation

Pavements outside shops may have to be laid between 18.00 and 20.00 on some days