Work for week commencing the 4 December 2017.
Between 4 December and 8th January 2018 improvement works will cease and Conway will not carrying out construction works.
- One way traffic flow throughout The High Street will change back to two way from 4.30 am Monday 4th December until Monday 8th January 2018.
- During this period TFL bus services will return to their normal, pre-work, routes. All the usual bus stops in the High Street will therefore be operational. Bus stop G (the new one at Beckenham Junction) will be closed during this period. TFL say that information will be displayed on the bus stops. For more information, please visit tfl.gov.uk/TempBusChanges “
- Beckenham Green has now been reopened to the public. The black surfacing is not the final surface. This will be a more appropriate aggregate surfacing which cannot be laid until late spring / summer when the weather is warmer.
Kelsey Square
Unfortunately Thames Water will be continuing works outside Kelsey Square until the second week in December. To assist with the two way traffic resuming, there will be temporary traffic signals in place. These works have no connection with the High Street improvement works.